SPECIAL EVENT ROAD CLOSURES:
GARDEN OF LIFE MARATHON
- Flagler Drive between Banyan Boulevard and Lakeview Avenue:
- Road closes on Friday, December 9, 2022 at 10:00 am, and reopens on Monday, December 12, 2022 at 7 am.
- South Flagler Drive between Okeechobee Boulevard and Dyer Road:
- Road closes on Saturday, December 10, 2022 at 6 am, with rolling openings starting at 9:15 am.
- South Olive Avenue between Barcelona Road and Southern Boulevard, and Dyer Road and Almeria Road east of South Olive Avenue:
- Road closed Saturday, December 10, 2022 at 6:45 am, with rolling openings starting at 9:15 am.
- North/South Flagler Drive from 59th Street to Dyer Road, South Olive Avenue between Almeria Road and Southern Boulevard, and Dyer Road and Almeria east of South Olive Avenue:
- Road closes Sunday, December 11, 2022 at 5 am, with rolling openings starting at noon.
CITY OF WEST PALM BEACH ENGINEERING CLOSURES
- Banyan Boulevard between Australian Avenue and Quadrille Boulevard (construction extended through first week of December 2022): The following traffic pattern changes within the Banyan Boulevard Streetscape Project.
-
- Intermittent lane closures for final inspections
- Access to the Federal Courthouse & Social Security Administration will be via eastbound Banyan Boulevard through the first week of December 2022.
- Access to the Social Security Administration surface parking lot will be via westbound Banyan Boulevard through the first week of December 2022.
- Pedestrian traffic will be maintained throughout the construction period.
- Northlake Boulevard west of Coconut Boulevard (until further notice): Periodic eastbound right turn lane closure for underground utility work.
- Tamarind Avenue between Banyan Boulevard and 7th Street. (completion delayed February 2023): Both directions for underground utility work and streetscape. Detours:
- Northbound Tamarind Avenue traffic should go east on Banyan Boulevard to Rosemary Avenue, north on Rosemary Avenue to 7th Street, and west on 7th Street to Tamarind Avenue.
- Southbound Tamarind Avenue traffic should go south on Australian Avenue to Banyan Boulevard and east on Banyan Boulevard to Tamarind Avenue South.
- Washington Road between Greenwood Drive and Monceaux Road construction extended through late Summer 2023): Road closures as part of a streetscape redesign, including new underground utilities, sidewalks, and storm drainage improvements. Detours:
- Northbound Washington Road traffic should go west on Monroe Drive to Olive Avenue, north on Olive Avenue to Almeria Road, and east on Almeria Road to Flagler Drive.
- Southbound Washington Road traffic should go west on Almeria Road to Olive Avenue, south on Olive Avenue to Monroe Drive, and east on Monroe Drive to Washington Road.
EVENT ROAD CLOSURES
- 300 block of Clematis Street (Saturday, December 3, 5 a.m. – 4 p.m.): Road closure for the West Palm Beach Antique Flea & Craft Market produced by Bill Jacobson
- 100 block of North and South Clematis Street, Narcissus Street between Banyan Boulevard and Datura Street, Lantana Avenue between Banyan Boulevard and North Clematis Street, and the 200 block of Clematis Street (Saturday, December 3, 2022, 5 a.m. – 4 p.m.). Road closure for the Greenmarket produced by the City of West Palm Beach Community Events
- 500 block of Clematis Street (Friday, December 2, 5 p.m. through Sunday, December 4, 11 p.m.): Road closed for a street event produced by Moonfest Inc.
PRIVATE PROJECT ROAD CLOSURES
- Icon Marina Village – North Flagler Drive between 43rd Street and 45th Street (construction extended through May 2023): Periodic closures of the northbound lane for the installation of underground utilities. Flaggers will assist motorists in the work zone.
- The Watermark – Datura Street between Quadrille Boulevard and South Dixie Highway (construction extended through mid-December 2022): The westbound lane is closed to construct a senior living facility. Motorists should use Clematis Street or Evernia Street as westbound alternatives.
- The Grand – 2nd Street between Rosemary Avenue and Sapodilla Avenue (construction extended one year to December 2023): Occasional flagging on 3rd Street.
- One Flagler – Chase Street between Lakeview Avenue and Okeechobee Boulevard (through December 2023): Road closed for construction. No sidewalk closures.
PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN THE CITY
- Australian Avenue at L.A. Kirksey/15th Street (until further notice): Periodic southbound right lane closures for underground utility installation.
- Australian Avenue south of Belvedere Road (until further notice): Periodic northbound right lane closures for pole installation.
- Belvedere Road between Bristol Drive and Australian Avenue (until further notice): Periodic eastbound right turn lane closures and westbound right lane closures for pole installation. Periodic northbound left-turn lane closure at South Australian Avenue for underground utility work.
- Congress Avenue south of Ware Drive to south of Chillingworth Drive (until further notice): Periodic nighttime double southbound right lane closures with traffic shift. Periodic daytime southbound right lane closure.
- 45th Street east of North Military Trail (until further notice): Periodic westbound right lane closures for underground utility work.
- 45th Street east of Northpoint Boulevard (until further notice): Periodic daytime westbound right turn lane closure for underground utility work.
- Jog Road north of Okeechobee Boulevard (until further notice): Periodic southbound right lane closure underground utility work.
- North Haverhill Road north of Caribbean Boulevard to Beeline Highway (until further notice): Intermittent lane closures and traffic shifted to the east side for road widening.
- North Florida Mango Road over the Palm Beach County L-2 Canal (north of Bridgeman Drive): Re-opened. Periodic northbound and southbound lane closures with flaggers controlling traffic.
- For more information about PBC road closures, contact PBC Engineering & Public Works at (561) 684-4000 or visit the Road & Bridge Construction List
FLORIDA DEPT. OF TRANSPORTATION (FDOT) ROAD CLOSURES IN THE CITY OF WPB
- Southern Boulevard (State Road 80) Bridge Replacement Project
- Flagler Drive from Southern Boulevard to Monroe Drive is closed through the end of 2022 as it is reconstructed. Access will be maintained for local traffic only. Traffic will be detoured as follows:
- Traffic going north on Flagler Drive should go west on Southern Boulevard to Washington Road; go north on Washington Road to Monroe Drive; go east on Monroe Drive to Flagler Drive.
- Traffic going south on Flagler Drive should go west on Monroe Drive to Washington Road; go south on Washington Road to Southern Boulevard; go east on Southern Boulevard.
- Flagler Drive from Southern Boulevard to Monroe Drive is closed through the end of 2022 as it is reconstructed. Access will be maintained for local traffic only. Traffic will be detoured as follows:
- North and southbound I-95 north of Forest Hill Boulevard to the south of 10th Avenue North in Lake Worth Beach (through Fall of 2023): I-95 may have one lane closed in each direction nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday, for upgrades in lighting, the installation of new pavement and a Road Weather Information System. Entrance and exit ramps will not be affected by construction. A full overnight closure of I-95 northbound is required to install new overhead sign structures. FDOT will provide ample notice before this operation.
- Southern Boulevard eastbound exit ramp to northbound Australian Avenue (through Spring 2023): Traffic is reduced to one lane for widening operations.
- For more information, contact FDOT: at (866) 336-8435 or http://www.fdot.gov/
CITY OF WEST PALM BEACH DOCKS
- Currie Park Boat Docks and Ramps (2400 North Flagler Drive): Ramps are open daily, from sunrise to sunset.
- Lake Mangonia Park Boat Ramps (2957 North Australian Avenue): Ramps are open daily, from sunrise to sunset.
- Clematis Street Docks (South Clematis Street at South Flagler Drive): Docks are open daily from 5 a.m. until midnight.
- Fern Street Dock (Fern Street at South Flagler Drive): The dock is open daily from 5 a.m. until midnight. No overnight dockage is allowed for boats, dinghies, or kayaks. The Fern Dock is also the home of a West Palm Beach Marine Patrol Boat and the West Palm Beach Fire Rescue Boat.
Originally published at https://www.wpb.org/Home/Components/News/News/3107/772?npage=4