Home Miami News Road and Dock Closures for June 28

Road and Dock Closures for June 28

Road and Dock Closures for June 28

CITY OF WEST PALM BEACH ENGINEERING, PUBLIC WORKS & UTILITY ROAD CLOSURES 

  • Southern Boulevard between Olive Avenue and Washington Road (through July 2023): One eastbound lane closure as repairs are made on road depressions. 
  • Monceaux Road between Dixie Highway (US 1) and Georgia Avenue (through August 2023): There will be intermittent lane closures for underground utility improvements. Access to all homes and businesses will be maintained. 
  • Alhambra Place between Olive Avenue the dead end, and Washington Road between Seville Road and Alhambra Place (through June 2023): Motorists should be prepared for possible lane closures for sanitary sewer rehabilitation. 
  • Northlake Boulevard west of Coconut Boulevard (until further notice): Periodic eastbound right turn lane closure for underground utility work. 
  • Washington Road between Roosevelt Place and Royal Palm Road (construction extended through July 2023): Road closures as part of a streetscape redesign, including new underground utilities, sidewalks, and storm drainage improvements. The following detours are in place:
    • Northbound Washington Road traffic should go west on Monroe Drive to Olive Avenue, north on Olive Avenue to Almeria Road, and east on Almeria Road to Flagler Drive.
    • Southbound Washington Road traffic should go west on Almeria Road to Olive Avenue, south on Olive Avenue to Monroe Drive, and east on Monroe Drive to Washington Road. 
  • Flagler Drive between Southern Boulevard and Greenwood Avenue (Thursday, June 29, 8 a.m. through Friday, July 7, 5 p.m.): The road is fully closed, local access only, for repaving and restriping.
  • 7th Street between Handy Avenue and 11th Street (through August 2023): The road is partially closed with flagging operations for swales lining and re-grading.
  • Lake Avenue between Belvedere Road and Park Place (through September 2023): Partial road closures with flagging operations for repaving and restriping.

 EVENT ROAD CLOSURES   

  • North & South Clematis between Narcissus Avenue and Flagler Drive, and Lantana Avenue between Banyan Boulevard and North Clematis Street (Thursday, June 29, from 4 p.m. until 10 p.m.): The road is closed for Clematis by Night With Mini Market produced by City of West Palm Beach Community Events. Note: event cancelled during the 4th of July week.
  • Rosemary Avenue between Okeechobee Boulevard and Hibiscus Street (Friday, June 30, 5 p.m. through Sunday, July 2, 10 p.m.): The road is closed for a street festival produced by Related. 
  • Flagler Drive between Banyan Boulevard and Lakeview Avenue (Monday, July 3, 9 a.m. through Wednesday, July 5, 12:00 p.m.): The road is closed for the 4th of July celebrations produced by City of West Palm Beach.
  • Flagler Drive between Lakeview Avenue and Barcelona Street (Tuesday, July 4, from 6 p.m. until 8:30 p.m.): The road is closed for the Bill Bone 5k footrace
  • 7th Street between Sapodilla and Rosemary, Henrietta between 7th and 8th, 8th between Henrietta and Rosemary, Rosemary between 7th and 8th (Friday, June 30, 9 a.m. through Saturday June 31, 2 a.m.): The roads are closed for the BBQ, Blues and Brew event produced by CRA.

PRIVATE PROJECT ROAD CLOSURES

  • Roxy’s – Clematis Street between Dixie Highway and Olive Avenue (Monday, July 10, through Friday, September 8):  Closure of the 300 block of Clematis to vehicular traffic in both directions. Pedestrian access is maintained; however, a short detour is in place due to closure of the northern sidewalk nearby the project site.
  • One Flagler – Chase Street between Lakeview Avenue and Okeechobee Boulevard (through Summer 2023): The road is closed for construction. The eastern sidewalk is closed for construction.
  • One Flagler – Lakeview Avenue between Flagler Drive and Chase Street (through February 2024): Single lane closure due to construction. No site deliveries in the work zone. 
  • 300 Clematis / 301 Banyan (through December 2023):
    • Sidewalk closures along site frontage on Banyan Blvd. and N Olive Ave
    • Alley north of Clematis St. closed between N Olive Ave and the Chase Bank plaza.
    • Closure of left-most lane along N Olive Ave. between Banyan Blvd. and Clematis St.
  • 575 Rosemary Office Tower – Rosemary Ave between Hibiscus and Fern St (Monday, June 26, 9 a.m. through Saturday, July 1, 4 p.m.): Full closure for crane removal
  • American Engineering Utilities Fern St between Rosemary Ave and Quadrille Blvd (Monday, July 10 through Sunday July 30):
    • Lane shift for milling & resurfacing work.
    • Temporary full closure on Wednesday, July 12, for manhole installation.

PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN THE CITY

  • Palm Beach Lake Boulevard east of the Palm Beach Outlets/Target Store entrance (until further notice): periodic right lane closures for pole installation and underground utility work. 
  • Roebuck Road Bridge over Florida’s Turnpike (until further notice): Temporary lane closures with flaggers controlling traffic for bridge maintenance. 
  • Congress Avenue from 45th Street to south of Echo Lake Drive (until further notice):  Periodic northbound right lane closure for underground utility work. 
  • Congress Avenue south of 45th Street (until further notice): Periodic daytime and nighttime lane closure pavement markings. 
  • Congress Avenue north of Presidio Place (until further notice): Periodic southbound right lane closure for FPL pole removal.  
  • Haverhill Road north of David’s Mack Drive (until further notice): Periodic northbound right lane closures for FPL pole replacement. 
  • Jog Road north of Okeechobee Boulevard to north of Snelgrove Way (until further notice): Periodic northbound and southbound left turn closures. 
  • Belvedere Road between Bristol Drive and Australian Avenue (until further notice): Periodic eastbound partial right turn lane closures and westbound right lane closures for pole installation. 
  • 45th Street west of Australian Avenue (until further notice): Periodic eastbound right turn lane closures for FPL pole removal. 
  • 45th Street west of Corporate Way (until further notice): Periodic eastbound right turn lane closure for underground utility work.
  • 45th Street east of Northpoint Boulevard (until further notice): Periodic daytime westbound right turn lane closure for underground utility work.   
  • For more information about PBC road closures, contact PBC Engineering & Public Works at (561) 684-4000 or visit the Road & Bridge Construction List

FLORIDA DEPT. OF TRANSPORTATION (FDOT) ROAD CLOSURES IN THE CITY OF WPB 

  • Southern Boulevard (State Road 80) Bridges Replacement Project (through Summer 2023)
    • Flagler Drive from Southern Boulevard to Monroe Drive is closed for reconstruction. Access will be maintained for local traffic only. Traffic will be detoured as follows:
      • Traffic going north on Flagler Dr. should go west on Southern Blvd. to Washington Rd., north on Washington Rd. to Monroe Dr., and east on Monroe Dr. to Flagler Dr. 
      • Traffic going south on Flagler Dr. should go west on Monroe Dr., east to Washington Rd., and south on Washington Rd. to Southern Blvd. 
  • Southern boulevard (State Road 80) Milling & Resurfacing (through July 2023)
    • Beginning Thursday, June 15, the eastbound outside lane of State Road 80/Southern Boulevard from Parker Avenue to Lake Avenue and from Dixie Highway to Washington Road may be closed nightly from 8 p.m. until 5 a.m., Sunday through Thursday through June 29 for lighting work.
    • One lane in each direction of State Road 80/Southern Boulevard from Parker Avenue to Lake Avenue and from Dixie Avenue to Washington Road may be closed nightly from 8 p.m. until 5 a.m., Sunday through Thursday, from Sunday, June 18 through June 29 and from Wednesday, July 5 through Thursday, July 13 for lighting and utility work.
  • SR 809/Military Trail at SR 882/Forest Hill Blvd Intersection Improvements (through Winter 2024)

    • Project limits: 0.7-mile at and nearby the intersection of SR 809 and SR 822.

     

    • Work includes widening, milling, and resurfacing, constructing additional right and left turn lanes, installing new 5-foot bike lanes at various locations along SR 882, improving sidewalks and driveways, installing four new signal mast arms at the intersection, and installing new signage and pavement markings.
    • One lane in each direction of Military Road from Sunset Ranch Road to Forest Hill Boulevard may be closed from 9:30 a.m. until 3:30 p.m., Monday through Friday, for utility location and FPL pole removal.

  CITY OF WEST PALM BEACH DOCKS

  • Currie Park Boat Docks and Ramps (2400 North Flagler Drive): Ramps are open daily, from sunrise to sunset.
  • Lake Mangonia Park Boat Ramps (2957 North Australian Avenue): Ramps are open daily, from sunrise to sunset. 
  • Clematis Street Docks (South Clematis Street at South Flagler Drive): Docks are open daily, from 5 a.m. until midnight. Please see 4th of July note.
  • Fern Street Dock (Fern Street at South Flagler Drive): The dock is open daily from 5 a.m. until midnight. No overnight dockage is allowed for boats, dinghies, or kayaks. The Fern Dock is also the home of a West Palm Beach Marine Patrol Boat and the West Palm Beach Fire Rescue Boat. Please see 4th of July note.
  • City Docks Operations on Monday, July 4th:
    • City docks will be open for vessels on a first come first serve basis. No rafting no open flames.
    • No entering or leaving the docks Monday, July 4, From 8 p.m. until 10 p.m. due to the fireworks show
    • Docks will not be accessible to pedestrians Monday, July 4, starting at 6 p.m.

Originally published at https://www.wpb.org/Home/Components/News/News/3508/772